Skip to main content
Emergency Action Plan Template · EHS Academy
🌐
🚨 Emergency Action Plan

Emergency Action Plan (EAP)

Written Plan — OSHA 29 CFR 1910.38

Required when employees must evacuate OR take emergency action in response to fire or other emergency
🆘 Emergency Contact Numbers — Post at all workstations and entry points
§1Purpose & Scope1910.38(a)

Regulatory requirement: An EAP must be in writing (for facilities with more than 10 employees), kept in the workplace, and available for employee review. It must cover procedures for emergency evacuation, medical emergencies, and shutdown.

Applies to:
Types of emergencies covered:
§2Emergency Roles & Responsibilities1910.38(b)(4)
RoleName / TitlePhone / RadioBackup
EAP Coordinator
Floor Warden(s)
First Aid Responder
Emergency Shutdown (Utilities)
Mobility-Impaired Assistance
Media / Communications
§3Alarm System & Reporting1910.38(b)(1)
Alarm system type:
Evacuation signal:
Shelter-in-place signal:
All-clear signal:
How to report an emergency:
§4Evacuation Procedures1910.38(b)(2-3)

Required: The EAP must include escape procedures and route assignments, and procedures for employees who must remain to perform critical operations before evacuating.

Evacuation route maps location:
Employees requiring special assistance:
Critical operations / shutdown before evacuation:
Assembly Point 1 (Primary)
Location Used by (floors/departments)
Assembly Point 2 (Alternate)
Location Used by (floors/departments)
Assembly Point 3
Location Used by
Head Count Procedure
Method Roster kept by
§5Fire Emergency Procedures1910.38 / 1910.157
Employees trained to use fire extinguishers:
§6Medical Emergency Procedures1910.151
AED location(s):
First aid kit location(s):
Trained first aid / CPR personnel:
§7Shelter-in-Place Procedures
Shelter-in-place triggers:
Shelter-in-place room(s):
§8Training & Drills1910.38(e)
EAP training timing:
Evacuation drill frequency:
Last drill date & outcome:
Next scheduled drill:

Drill results are documented, reviewed with wardens, and used to identify improvements to the plan. Corrective actions from drills are tracked and resolved within 30 days.

Approval & Sign-Off